Open now Office today 07:30 – 17:30

Sites: Saturday – Thursday 07:00 – 18:00

412days without a lost-time incident

Main contractor for villas, warehouses and structural works — United States

Built on solid columns and clear numbers.

Villas, warehouses, steel structures and structural works in the United States: a priced bill of quantities before you sign, a named site engineer on every project, a weekly photo report, and payments that fall due only when each stage is finished.

  • Priced bill of quantities before signing
  • A named site engineer on every project
  • 10-year structural warranty
Next free visit: Today10:30 · Khalid N.

Who we are

One main contractor
from excavation to keys.

We build villas, warehouses and steel structures in the United States: one engineering team handles excavation, structure, MEP and finishes, and hands you a finished building with its completion certificate and warranty file.

We work from your consultant's drawings or with licensed consultancies we introduce you to, and write the schedule and payments into the contract before the first concrete is poured.

About the company
A modern two-storey villa with a pool and glass facades at dusk
Turnkey handover — month 14

Stages & payments

From the ground to the keys,
a payment after each stage.

A 10% advance on signing against a bank guarantee, then a payment after each stage the consultant approves. This is the programme of a typical 5,000 sq ft G+1 villa.

  1. 01Weeks 1–8

    Excavation & foundations

    • Excavation, levelling and compacted backfill
    • Termite control and footing waterproofing
    • Pouring footings, tie beams and the ground slab

    15%of the contract value once the stage is approved

  2. 02Weeks 9–20

    Concrete frame

    • Columns and slabs for both floors and the roof
    • Rebar checked with the consultant before every pour
    • Concrete cube tests in an accredited laboratory

    25%of the contract value once the stage is approved

  3. 03Weeks 21–30

    Blockwork & plaster

    • External and internal blockwork
    • Internal and external plaster
    • Roof waterproofing and insulation

    15%of the contract value once the stage is approved

  4. 04Weeks 26–40

    MEP works

    • Power, plumbing and drainage runs
    • Air-conditioning ducts and units
    • Pressure and insulation tests before closing up

    10%of the contract value once the stage is approved

  5. 05Weeks 36–52

    Finishes & facades

    • Tiling, paint and suspended ceilings
    • Windows, doors and facades
    • Kitchen, bathrooms and lighting

    15%of the contract value once the stage is approved

  6. 06Weeks 52–56

    Inspection & handover

    • The snag list, closed out with you
    • Completion certificate and utility connections
    • Keys, as-built drawings and the warranty file

    10%of the contract value once the stage is approved

Our promises, in writing

Six commitments
in every contract we sign.

  • P‑01Within 10 working days

    Priced bill of quantities before signing

    Every item with its quantity and price in one schedule, so you know where every USD goes before you sign.

  • P‑02On site daily

    A named site engineer

    A responsible engineer you know by name and number, on your site every day and answering you the same day.

  • P‑03Every Thursday

    Weekly photo report

    Progress, site photos, next week's works and any decision waiting for your approval.

  • P‑04Advance + 6 stages

    Payments tied to stages

    A payment falls due only after a defined stage is finished and approved by the consultant.

  • P‑05+ a year of maintenance

    10-year structural warranty

    We guarantee the structure for ten years from handover, with a full year of maintenance.

  • P‑06412 days without an incident

    Safety first

    A safety briefing every morning, and a board on every site showing the days without an incident.

Engineering team

Engineers you know by name,
slots you see now.

Each engineer's next free slot is worked out from their weekly schedule and refreshes on the page by itself.

Weekly report

This is how your site
reaches you every Thursday.

Photos, progress and the engineer's note, from excavation to handover. These are illustrative samples from a G+1 villa report.

Indicative prices

Prices to start from,
the final one from the BOQ.

2026 figures per square foot of built-up area in the United States, so you know your budget range before the visit. The final price is set item by item in the priced bill of quantities.

Price details
  • Consultation & survey

    Consultation visit

    No fee Free

    An engineer visits your plot or building, or you visit our office: a read of the drawings, written notes and a first price range before you commit to anything.

    Includes 4 items
    • A visit to the plot or building in Dubai, or a meeting at the office
    • A read of the plot plan and any early design
    • Written notes within two working days
    • A first price range and expected duration
    Book a visit
  • Consultation & survey

    Site survey & feasibility report

    From 410 USD

    A topographic survey of the plot, what the planning rules allow, and a cost estimate at three finish levels, in one report within a week.

    Usual duration: 1 week

    Includes 6 items
    • Topographic survey of the plot with a total station
    • Review of setbacks, heights and plot coverage
    • The soil investigation needed and its cost
    • A first schedule
    • A cost estimate at three finish levels
    • The fee is deducted from the contract when you sign
    Book a visit
  • Villas

    Shell & core villa

    From 50 USD / sq ft

    Foundations, concrete frame, blockwork, external plaster and insulation, for owners who want to finish the interiors their own way.

    Usual duration: about 8 months

    Includes 6 items
    • Excavation, backfill and termite control
    • Foundations and the full concrete frame
    • External and internal blockwork
    • External plaster and roof waterproofing and insulation
    • First-fix power and plumbing
    • No interior finishes
    Book a visit
  • Warehouses

    Steel-frame warehouse

    From 26 USD / sq ft

    Heavy-duty foundations and floor, a galvanised steel frame, insulated cladding, loading doors and fire alarm, ready to operate.

    Usual duration: about 7 months

    Includes 6 items
    • Heavy-duty foundations and concrete floor
    • Galvanised, painted prefabricated steel frame
    • Roof and wall cladding in insulated panels
    • Loading doors and emergency exits
    • Lighting, basic power and fire alarm
    • An office of up to 100 m²
    Book a visit
  • Extensions & annexes

    Extension or annex

    From 71 USD / sq ft

    Extra rooms or an annex for guests or a driver, structurally tied to your villa and matching its finishes, with the family still at home.

    Usual duration: about 4 months

    Includes 5 items
    • Inspection of the existing building and change approvals
    • Foundations, structure and the tie to the existing building
    • Finishes matching the original villa
    • Power, plumbing and cooling tied into the existing systems
    • Dust screens and work at agreed hours
    Book a visit

Illustrative prices that exclude government fees and connections, and vary with the design, specification and location.

Common questions

Before
we start building.

Didn't find your question? Call or message us and an engineer will answer during working hours.

Who gets the building permits?

We follow the whole file with the registered consultant: approvals from the relevant local authorities, through to the building permit and then the completion certificate. Government fees appear as a separate item in the bill of quantities, at their official invoices.

How long does a villa take?

A G+1 villa of 4,000 to 6,000 sq ft usually takes 12 to 14 months from the building permit to handover, plus the time for permits (usually 6 to 10 weeks). We write the schedule into the contract stage by stage.

How do payments work?

A 10% advance against a bank guarantee, then a payment after each finished stage: foundations 15%, frame 25%, blockwork and plaster 15%, MEP 10%, finishes 15% and handover 10%. No payment falls due before the consultant approves the stage.

What warranty do you give?

A ten-year structural warranty from handover, a full year of maintenance for finishes and MEP works, plus the suppliers' warranties on equipment such as air conditioners and water heaters.

Can I visit the site?

Of course. Book a visit with your site engineer on any working day, and we will have a helmet and vest for you at the gate. If you cannot come, a report with photos and progress reaches you every Thursday.

Do you work outside the United States?

Our projects are mainly in the United States, and we take villa and warehouse projects in the United States on request, after a site visit and a review of the local municipality's requirements.

When do I receive the bill of quantities?

Within 10 working days of receiving the approved drawings or the early design, with the proposed materials list and cost-saving alternatives if you wish.

I have no drawings yet. What do I do?

If your consultant has drawings, we price them as they are. If not, we introduce you to licensed consultancies we work with, so design and build become one team.

Building guides

Before you start,
read these.

All guides

Visit us

Our office is in the United States
.

Illustrative map of the Al Noor officeThe office is in the United States.Green CommunityBuilding 3Metro station (Route 2020)Main StreetMain StreetCity centreTo Expo CityCity centreشركة النورN

Illustrative map — not to scale

United States

  • Enter from Main Street, then follow the signs to the building.
  • You can visit our office during working hours.
  • Saturday – Thursday 07:30 – 17:30 · Friday Closed

Office hours

Open now until 17:30

Weekly office hours, United States time
Saturday 07:30 – 17:30
Sunday 07:30 – 17:30
Monday 07:30 – 17:30
Tuesday 07:30 – 17:30
Wednesday 07:30 – 17:30
Thursday 07:30 – 17:30
Friday Closed

Sites work Saturday to Thursday from 07:30 to 17:30, and site visits are arranged in advance with the engineer.

Book an office meeting

The first step

Your first site visit is on us.

A civil engineer visits your plot or building on any working day, reads the drawings with you, measures and photographs, then tells you what it will take before you commit: the permits needed, the expected time and a rough price range.