
Week 03 6% complete
The block foundation walls are ready for waterproofing, and the starter bars are in place as drawn.
Main contractor for villas, warehouses and structural works — United States
Villas, warehouses, steel structures and structural works in the United States: a priced bill of quantities before you sign, a named site engineer on every project, a weekly photo report, and payments that fall due only when each stage is finished.
Who we are
We build villas, warehouses and steel structures in the United States: one engineering team handles excavation, structure, MEP and finishes, and hands you a finished building with its completion certificate and warranty file.
We work from your consultant's drawings or with licensed consultancies we introduce you to, and write the schedule and payments into the contract before the first concrete is poured.
About the company

Services
Choose a service to see its scope, its engineers and common questions, and book a visit with the right engineer.






Stages & payments
A 10% advance on signing against a bank guarantee, then a payment after each stage the consultant approves. This is the programme of a typical 5,000 sq ft G+1 villa.
01Weeks 1–8
15%of the contract value once the stage is approved

02Weeks 9–20
25%of the contract value once the stage is approved

03Weeks 21–30
15%of the contract value once the stage is approved

04Weeks 26–40
10%of the contract value once the stage is approved

05Weeks 36–52
15%of the contract value once the stage is approved

06Weeks 52–56
10%of the contract value once the stage is approved

Our promises, in writing
P‑01Within 10 working days
Every item with its quantity and price in one schedule, so you know where every USD goes before you sign.
P‑02On site daily
A responsible engineer you know by name and number, on your site every day and answering you the same day.
P‑03Every Thursday
Progress, site photos, next week's works and any decision waiting for your approval.
P‑04Advance + 6 stages
A payment falls due only after a defined stage is finished and approved by the consultant.
P‑05+ a year of maintenance
We guarantee the structure for ten years from handover, with a full year of maintenance.
P‑06412 days without an incident
A safety briefing every morning, and a board on every site showing the days without an incident.
Engineering team
Each engineer's next free slot is worked out from their weekly schedule and refreshes on the page by itself.
Project Management & Supervision
Visits clients' sitesStructural Works & Foundations
Visits clients' sitesMEP Works
Visits clients' sitesVilla Construction
Visits clients' sitesWarehouses & Steel Structures
Visits clients' sitesExtensions & Renovation
Visits clients' sitesWeekly report
Photos, progress and the engineer's note, from excavation to handover. These are illustrative samples from a G+1 villa report.

Week 03 6% complete
The block foundation walls are ready for waterproofing, and the starter bars are in place as drawn.

Week 06 11% complete
Tying the raft reinforcement and checking it with the consultant before the pour.

Week 07 13% complete
Footings poured at 5 am before the heat, then seven days of curing with water and covers.

Week 11 22% complete
Formwork for the ground-floor columns and walls; the pour is on Sunday.

Week 15 30% complete
Ground-floor slab reinforcement, with the electrical conduits laid in the slab before the pour.

Week 24 45% complete
Scaffolding around the first floor, and the external blockwork has started.

Week 38 70% complete
The external plaster is complete, and the facade windows go in this week.

Week 55 97% complete
The pool is ready, and the final snagging walk with you is on Tuesday before handover.
Indicative prices
2026 figures per square foot of built-up area in the United States, so you know your budget range before the visit. The final price is set item by item in the priced bill of quantities.
Consultation & survey
No fee Free
An engineer visits your plot or building, or you visit our office: a read of the drawings, written notes and a first price range before you commit to anything.
Consultation & survey
From 410 USD
A topographic survey of the plot, what the planning rules allow, and a cost estimate at three finish levels, in one report within a week.
Usual duration: 1 week
Villas
From 50 USD / sq ft
Foundations, concrete frame, blockwork, external plaster and insulation, for owners who want to finish the interiors their own way.
Usual duration: about 8 months
Villas Most popular
From 90 USD / sq ft
From excavation to keys: structure, MEP, finishes, facades and the completion certificate, with one team and one responsibility.
Usual duration: about 13 months
Warehouses
From 26 USD / sq ft
Heavy-duty foundations and floor, a galvanised steel frame, insulated cladding, loading doors and fire alarm, ready to operate.
Usual duration: about 7 months
Extensions & annexes
From 71 USD / sq ft
Extra rooms or an annex for guests or a driver, structurally tied to your villa and matching its finishes, with the family still at home.
Usual duration: about 4 months
Illustrative prices that exclude government fees and connections, and vary with the design, specification and location.
Common questions
Didn't find your question? Call or message us and an engineer will answer during working hours.
We follow the whole file with the registered consultant: approvals from the relevant local authorities, through to the building permit and then the completion certificate. Government fees appear as a separate item in the bill of quantities, at their official invoices.
A G+1 villa of 4,000 to 6,000 sq ft usually takes 12 to 14 months from the building permit to handover, plus the time for permits (usually 6 to 10 weeks). We write the schedule into the contract stage by stage.
A 10% advance against a bank guarantee, then a payment after each finished stage: foundations 15%, frame 25%, blockwork and plaster 15%, MEP 10%, finishes 15% and handover 10%. No payment falls due before the consultant approves the stage.
A ten-year structural warranty from handover, a full year of maintenance for finishes and MEP works, plus the suppliers' warranties on equipment such as air conditioners and water heaters.
Of course. Book a visit with your site engineer on any working day, and we will have a helmet and vest for you at the gate. If you cannot come, a report with photos and progress reaches you every Thursday.
Our projects are mainly in the United States, and we take villa and warehouse projects in the United States on request, after a site visit and a review of the local municipality's requirements.
Within 10 working days of receiving the approved drawings or the early design, with the proposed materials list and cost-saving alternatives if you wish.
If your consultant has drawings, we price them as they are. If not, we introduce you to licensed consultancies we work with, so design and build become one team.
Building guides
Before any excavator moves on your plot, your project goes through a chain of approvals led by a registered consultant. Here are the steps in order, the usual timings and what typically holds them up.
Your contractor turns drawings into concrete and steel, and you will deal with them daily for over a year. Ten questions to compare offers with an expert eye.
In hot weather, water leaves fresh concrete faster than it needs to harden, so it weakens and cracks unless protected. What happens, how we pour and cure, and how we check the result.
Visit us
Illustrative map — not to scale
Open now until 17:30
| Saturday | 07:30 – 17:30 |
|---|---|
| Sunday | 07:30 – 17:30 |
| Monday | 07:30 – 17:30 |
| Tuesday | 07:30 – 17:30 |
| Wednesday | 07:30 – 17:30 |
| Thursday | 07:30 – 17:30 |
| Friday | Closed |
Sites work Saturday to Thursday from 07:30 to 17:30, and site visits are arranged in advance with the engineer.
Book an office meeting
The first step
A civil engineer visits your plot or building on any working day, reads the drawings with you, measures and photographs, then tells you what it will take before you commit: the permits needed, the expected time and a rough price range.