Open now Office today 07:30 – 17:30

Sites: Saturday – Thursday 07:00 – 18:00

412days without a lost-time incident

Indicative prices

Shell & core villa

Foundations, concrete frame, blockwork, external plaster and insulation, for owners who want to finish the interiors their own way.

Villas

about 8 months

6 items

From Ask for the price / sq ft

We build your villa to a complete shell: a tested concrete frame, blockwork walls, external plaster, roof insulation and first-fix power and plumbing inside the walls and slabs.

Who it suits

  • Owners with a fit-out contractor or interior designer they prefer.
  • Owners who want to spread the budget over two phases.
  • Investors handing villas to buyers who choose their own finishes.

Duration

About eight months from the building permit for a G+1 villa of 4,000 to 6,000 sq ft, with a written stage-by-stage schedule.

What the price covers

  • Excavation, backfill and termite control
  • Foundations and the full concrete frame
  • External and internal blockwork
  • External plaster and roof waterproofing and insulation
  • First-fix power and plumbing
  • No interior finishes

An indicative price the project starts from; the final price comes from the priced bill of quantities after the visit and the drawings. Prices exclude government fees.

Other prices

Compare
and choose your scope.

  • Consultation & survey

    Consultation visit

    No fee Free

    An engineer visits your plot or building, or you visit our office: a read of the drawings, written notes and a first price range before you commit to anything.

    Includes 4 items
    • A visit to the plot or building in Dubai, or a meeting at the office
    • A read of the plot plan and any early design
    • Written notes within two working days
    • A first price range and expected duration
    Book a visit
  • Consultation & survey

    Site survey & feasibility report

    From 410 USD

    A topographic survey of the plot, what the planning rules allow, and a cost estimate at three finish levels, in one report within a week.

    Usual duration: 1 week

    Includes 6 items
    • Topographic survey of the plot with a total station
    • Review of setbacks, heights and plot coverage
    • The soil investigation needed and its cost
    • A first schedule
    • A cost estimate at three finish levels
    • The fee is deducted from the contract when you sign
    Book a visit

The first step

Your first site visit is on us.

A civil engineer visits your plot or building on any working day, reads the drawings with you, measures and photographs, then tells you what it will take before you commit: the permits needed, the expected time and a rough price range.