Consultation & survey
Site survey & feasibility report
From 410 USD
A topographic survey of the plot, what the planning rules allow, and a cost estimate at three finish levels, in one report within a week.
Usual duration: 1 week
Includes 6 items
- Topographic survey of the plot with a total station
- Review of setbacks, heights and plot coverage
- The soil investigation needed and its cost
- A first schedule
- A cost estimate at three finish levels
- The fee is deducted from the contract when you sign

