Structural Works & Foundations
Visits clients' sitesServices
Structural Works & Foundations
Calculated foundations and concrete frames, with the rebar checked before every pour.
1 engineer

Structural Works & Foundations with شركة النور
We carry out structural works for our own projects and for other developers and contractors: excavation and shoring, piles, rafts and pad footings, and columns, beams and slabs up to the roof. Where the water table is close to the surface, we dewater and waterproof accordingly.
Every pour is preceded by a rebar and formwork inspection with the consultant, and test cubes go to an accredited laboratory at 7 and 28 days; the results are filed in the project record you receive.
Scope of work
- Excavation, shoring and dewatering
- Piles, footings and rafts
- Foundation waterproofing and termite control
- Columns, beams and slabs
- Concrete testing in an accredited laboratory
- Structural repair and strengthening
The final scope is written item by item in the bill of quantities and the contract.
Engineers & slots
Structural Works & Foundations engineers
Each engineer's next free slot is worked out from their weekly schedule.
Common questions
Questions about
Structural Works & Foundations.
Ready for a visit?
Choose the engineer, day and time in under a minute, and we confirm within one working hour.
When are piles needed?
The soil report decides. If the upper layers are weak or the water table is high, the structural engineer recommends piles or a raft instead of pad footings.
How long before the formwork comes off?
Side formwork usually after one or two days, slab formwork after 7 to 14 days depending on the span, the cube results and the engineer's instructions.
Do you do structural works for other contractors?
Yes. We work as a structural subcontractor for developers and main contractors, under a clear contract and scope.