Warehouses & Steel Structures
Visits clients' sitesServices
Warehouses & Steel Structures
Warehouses and workshops on prefabricated steel frames, handed over in months, not years.
1 engineer

Warehouses & Steel Structures with شركة النور
We build storage warehouses, workshops and hangars of 500 to 10,000 square metres in industrial areas. We start with the soil investigation, foundations and a concrete floor designed for heavy loads, then erect the galvanised steel frame and clad it in insulated panels.
We add offices, mezzanines, loading doors and fire alarm and fire-fighting systems to the relevant authorities requirements, and hand the building over ready to operate, with its completion certificate.
Scope of work
- Soil investigation, foundations and industrial floors
- Galvanised prefabricated steel frame
- Roof and wall cladding in insulated panels
- Mezzanines and offices
- Loading doors and ramps
- Fire alarm and fire-fighting systems
The final scope is written item by item in the bill of quantities and the contract.
Engineers & slots
Warehouses & Steel Structures engineers
Each engineer's next free slot is worked out from their weekly schedule.
Indicative prices
Warehouses & Steel Structures prices
Prices to start from; the final price comes from the priced bill of quantities.
Warehouses
Steel-frame warehouse
From 26 USD / sq ft
Heavy-duty foundations and floor, a galvanised steel frame, insulated cladding, loading doors and fire alarm, ready to operate.
Usual duration: about 7 months
Book a visitIncludes 6 items
- Heavy-duty foundations and concrete floor
- Galvanised, painted prefabricated steel frame
- Roof and wall cladding in insulated panels
- Loading doors and emergency exits
- Lighting, basic power and fire alarm
- An office of up to 100 m²
Common questions
Questions about
Warehouses & Steel Structures.
Ready for a visit?
Choose the engineer, day and time in under a minute, and we confirm within one working hour.
How long does a warehouse take?
A 2,000 square metre warehouse usually takes 6 to 8 months from the permit, because the steel frame is fabricated in the factory while the foundations are built.
What is the largest span without internal columns?
We design clear spans of up to about 40 metres depending on loads and height; the structural engineer sets the right span once we know how the building will be used.
Do you handle the relevant authorities approvals?
Yes. We prepare the fire alarm and fire-fighting drawings with the consultant and attend the inspections until the completion certificate.
