Open now Office today 07:30 – 17:30

Sites: Saturday – Thursday 07:00 – 18:00

412days without a lost-time incident

Indicative prices

Turnkey villa

From excavation to keys: structure, MEP, finishes, facades and the completion certificate, with one team and one responsibility.

Villas

about 13 months

6 items

From Ask for the price / sq ft

Our most requested option: a finished villa you move into with your suitcase. We take on everything from excavation to utility connections, and you follow progress through the weekly report and the visits you book with the site engineer.

Specification

The bill of quantities offers you three finish levels and you choose what suits you for each item: tiles and marble, doors and windows, kitchen and bathrooms, lighting. Every choice is recorded in writing before ordering.

Duration and warranty

  • 12 to 14 months from the building permit for a G+1 villa.
  • A ten-year structural warranty and a full year of maintenance after handover.

What the price covers

  • All foundation and structural works
  • Complete MEP works including air conditioning
  • Tiles, marble, doors and insulated aluminium windows
  • Kitchen, bathrooms and lighting
  • Facades, boundary walls and external paths
  • Completion certificate and utility connections

An indicative price the project starts from; the final price comes from the priced bill of quantities after the visit and the drawings. Prices exclude government fees.

Other prices

Compare
and choose your scope.

  • Consultation & survey

    Consultation visit

    No fee Free

    An engineer visits your plot or building, or you visit our office: a read of the drawings, written notes and a first price range before you commit to anything.

    Includes 4 items
    • A visit to the plot or building in Dubai, or a meeting at the office
    • A read of the plot plan and any early design
    • Written notes within two working days
    • A first price range and expected duration
    Book a visit
  • Consultation & survey

    Site survey & feasibility report

    From 410 USD

    A topographic survey of the plot, what the planning rules allow, and a cost estimate at three finish levels, in one report within a week.

    Usual duration: 1 week

    Includes 6 items
    • Topographic survey of the plot with a total station
    • Review of setbacks, heights and plot coverage
    • The soil investigation needed and its cost
    • A first schedule
    • A cost estimate at three finish levels
    • The fee is deducted from the contract when you sign
    Book a visit
  • Villas

    Shell & core villa

    From 50 USD / sq ft

    Foundations, concrete frame, blockwork, external plaster and insulation, for owners who want to finish the interiors their own way.

    Usual duration: about 8 months

    Includes 6 items
    • Excavation, backfill and termite control
    • Foundations and the full concrete frame
    • External and internal blockwork
    • External plaster and roof waterproofing and insulation
    • First-fix power and plumbing
    • No interior finishes
    Book a visit

The first step

Your first site visit is on us.

A civil engineer visits your plot or building on any working day, reads the drawings with you, measures and photographs, then tells you what it will take before you commit: the permits needed, the expected time and a rough price range.